Monitoring
| Handing over the monitoring report to the IE | The project applicant prepares monitoring reports at regular intervals. These reports contain all data necessary for calculating the emission reductions generated. The project applicant delivers the monitoring reports to the IE at regular intervals. |
| Verification | Verification takes place at regular intervals and is an examination and a confirmation of the emission reductions achieved according to the monitoring report by the IE. |
| Verification report | The Independent Entity prepares a verification report, which must be made publicly available through the climate secretariat. |









